OEE Coach Software Help
Print

10. Three Rejects; output > expected

Table of Contents

10. Three Rejects; output > expected

In this example

  • Shifttime:                                          500 min
  • Production  time:                           100 min
  • Waiting:                                            400 min
  • Max output:                                     100min x 1000 pcs = 100.000 pcs
  • Set speed                                          800 pcs/min
  • Expected output:                            100min x 800 pcs = 80.000 pcs
  • Actual Output:                                 70.000 Good Product
    •                                                  6.000 Rework
    •                                                  4.000 Scrap
    •                                                  1.000 Sub-spec

Result

  1. Availability 20% (100min/500min)
  2. Performance: 60% (Actual output / Maximum Output)
  3. Quality: Good Product / (Good+Rejects) = 86%
  4. OEE = 20% x 81% x 86% = 14%
  5. Error marker at Validation Errors tab