OEE Coach Software Help
Print

11. Two runs with parallel output

Table of Contents

11. Two runs with parallel output

In this example

  • Shifttime:                                        500 min
  • Production Run A:                         100 min
    •   Output 1                             100.000 (Set Speed 1000 pcs/min)
    •   Output 2                             100 (Set Speed 1 pcs/min)
  • Production Run B:                         10 min
    •   Output 3                             10.000 (Set Speed 1000 pcs/min)
    •   Output 4                             10 (Set Speed 1 pcs/min)
  • Waiting:                                           390 min

Result

  1. Availability 22% (110min/500min)
  2. Performance: 100% (Actual output / Maximum Output)
  3. Quality: Good Product / (Good+Rejects) = 100%
  4. OEE = 22% x 100% x 100% = 22%