14. Two runs, two products, two performances (minor stops+ speed loss)

Table of Contents

14. Two runs, two products, two performances (minor stops + speed loss)

In this example

  • Shift time:                                       500 min
  • Production Run A:                         100 min
    •   Output 1                                 50.000 (Set Speed 800 pcs/min)
    •   Output 2                                 50 (Set Speed 0,7 pcs/min)
  • Production Run B:                         10 min
    •   Output 3                                  4.500 (Set Speed 700 pcs/min)
    •   Output 4                                  5 (Set Speed 0,6 pcs/min)
  • Waiting:                                            390 min

Result

  1. Availability 22% (110min/500min)
  2. Performance: 49,8% (Weighted average!!)
  3. Quality: Good Product / (Good+Rejects) = 100%
  4. OEE = 22% x 49,77% x 100% = 10,95%